What changed for the client

About 1.5x more production deploys per working day

Before and after, from the case

  • ~1.5xproduction deploys per working day

    Before0.63September to November 2025, 41 deploys
    Now1.03The 90 days to 2026-11-15, 67 deploys
  • 4 → 17services deploying to production

    Before4September to November 2025
    Now17The 90 days to 2026-11-15

Drawn from the case figures. The client is not named and its product is not shown.

How it was hired

Team
6 people: 1 Scrum Master, 1 architect, 2 platform engineers, 1 SRE and 1 DevOps engineer
Duration
About 11 months since December 2025, ongoing
To hire the same
Staff augmentation

What we built

  • Reusable CI
  • Developer portal
  • GitOps
  • Kubernetes clusters as code
  • Secrets and database self-service
  • Engineering metrics (DORA)

Services used

Nine pieces of the platform, each with a consumer

Each piece has a real consumer in the client's repositories, checked in October 2026. We did not check them against running pods. Git cannot separate our commits from the client's, so these are the pieces our team was assigned, not a per-commit attribution.

  • Reusable CI workflows called from 79 repositories (248 calls: image build, integration, tags, deploy).
  • A CI actions library used by 28 repositories and by the reusable workflows themselves.
  • A Backstage developer portal deployed through GitOps, with service templates whose skeletons already carry the standard CI.
  • A GitHub events exporter for DORA metrics, deployed through GitOps and used as the source of the DORA rules.
  • A base library for metrics exporters, reused by the DORA exporter and by the cloud-cost exporter.
  • Kubernetes clusters managed as code, one of them for regulated workloads, with Argo CD for production and preprod.
  • A custom PostgreSQL secrets operator on CloudNativePG, with production and preprod configuration.
  • An automated backup of the sealed-secrets keys: a cronjob with production and preprod configuration.
  • Self-service PostgreSQL databases with Crossplane, as a versioned package with production and preprod overlays.

Kubernetes, Argo CD, Backstage, Crossplane, CloudNativePG, Sealed Secrets, GitHub Actions

  • 79

    repositories on reusable CI workflows

Questions about this case

Who is the client?

A US transportation services company. We publish the case without its name, as agreed.

What does Clouditive do for this transportation company?

Platform engineering, DevOps and SRE: reusable CI, a Backstage developer portal, GitOps with Argo CD, Kubernetes clusters as code and self-service PostgreSQL databases.

How much did deploy frequency change?

About 1.5x more production deploys per working day, and 17 services deploying to production, up from 4. It was 0.63 deploys per working day from September to November 2025 and 1.03 in the 90 days to 2026-11-15.

How did you count a deployment?

As a commit on the main line of the GitOps repository that Argo CD reads, changing an image tag under the production apps. We left out first-time service creations and third-party images, and we report the mean because the median is zero.

Is the 1.5x all yours?

No. It is the organization's figure, and the client's engineers deploy through the same repositories. We did not isolate our share.

How large is the team, and for how long?

Six people: one Scrum Master, one architect, two platform engineers, one SRE and one DevOps engineer. About 11 months since December 2025, and the work continues.